Escalib Mills_GB

8 E S C A L I B M I L L S : S I T E S P I R A L S T A I R T O W E R W I T H S I D E E X I T . Lifting and moving (no more than 8 modules) ... > 1 -Reposition the guardrails to prevent side exit. Check that the M24 screws are tight.Attach the crane hooks to the 2 lifting rings. Detach the anchors. > 2 - Move the Escalib Mills stair tower. The orientation depends on the height of stair tower required and is adjusted by turning through 90°. Install 80mm from wall to facilitate pivoting of the guardrails at the access level. WARNING: Check that the ground on which the Escalib Mills is to be erected is able to withstand the load. REQUIREMENTS: > Check before use that the railings are correctly locked. > Fit new anchors as new modules are added. > Dismantle in the reverse order of assembly. > Lifting max. 8 modules simultaneously. WARNING: Comply with the general rules for handling and stability. WARNING: Lifting an Escalib Mills by the ring of the central standard is prohibited. This operation seriously damages the topmost module. The two main lifting rings must be used and the last module has to be equipped with the barrier gate. > 3 - Position on the ground and level the Escalib Mills. > 4 - Anchor the Escalib Mills tower before removing the slings from the crane. > 5 - At the access levels, the rails are positioned so as to privilege access by the main side A (side names shown on the sticker). > 6 - Check that the stair tower has been anchored before unhooking the slings. Swing the guardrails out of the way to allow access to the required level. 30° max. NT 010 - ESCALIB MILLS TECHNICAL INFORMATION

RkJQdWJsaXNoZXIy OTQ2MzM=