The Vinci group is building a viaduct over the Durance at Cavaillon (Vaucluse).
Mills has provided 30 tonnes of Mills Tour MT 100 shoring (10 tonnes per foot) to build columns on the river bed piles.
To build the interchange deck Mills has planned and assembled 60 tonnes of Mills Tour and then installed flyovers with telescopic girders and covered it all with Mills Pano formwork tables.
This new link road will help to reduce congestion in the city centre and directly serve the industrial area by connecting to the Cavaillon south ring road.